Case Study
overlay
ADTR-023 DMC Feed Pump at Coal Mine

14 belt drive with made to order pulleys lasting 1 month, replaced with 10 belt Predator drive to last 12 months.

Case Study
overlay
ADTR-009 Diamond Z Tub Grinder

Predator lasts 24 months on Tub Grinder where previously three to four weeks at best were achieved.

Case Study
overlay
APC-026 Cotton Ginning Trash Conveyor Drive

Cotton ginning drive operated now for two seasons with zero maintenance or lubrication requirements.

Case Study
overlay
APC-015 Cooling Tower Fans

Rubber timing belt rots on wet cooling tower drives. Poly Chain GT Carbon thrives in wet environment so far achieving 13 months.

Case Study
overlay
ADTR-013 Cone Crusher

Weight reduction on drive with significant reduction of downtime and maintenance costs.

Case Study
overlay
APC-024 Coal Mining Dewatering Pump

New drive using Poly Chain GT Carbon belt to deliver required power transmission in only 90mm width.

Case Study
overlay
ADTR-021 Coal Mine Rejects Pump

8 Predator Belts replace 10 standard belts on 450kW rejects pump at Bowen Basin coal mine.

Case Study
overlay
ADTR-022 Coal Handling and Preparation Plant Weir Warman Slurry Pump

Tahmoor Coal Wash Plant upgrades to Predator on 150kW Weir Warman Pump drive and lasts 4 times longer.

Case Study
overlay
AIHM-001 Chemical Transfer Hose at Chemical Recycling Plant

The Gates acid-chemical hose provides benefits of extended service life, reduced maintenance and replacement costs.

Case Study
overlay
ADV-001 Cotton Gin Double Sided V Belt

Cotton Gins operate for entire season without downtime and no belt replacements.